VPR Flight Plan

Air Provider Information:

Please check in with Naomi Whitty (907.590.3954) upon arrival in Cordova.

Naomi will be Cordova, arrive 5pm on 2 July, to coordinate the beginning of flight operations.


Helicopter

Coastal Helicopters, Inc.
8995 Yandukin Drive
Juneau, Alaska 99801

Attn. Mike Rawson

http://www.coastalhelicopters.com/

Phone: 907-789-5600

Fax: 907-789-7076


Sky Van

A.G Sholton Company D/B/A

Pioneer Airways

1937 Loussac Drive

Anchorage, AK 99517

907.244.4067


Fixed Wing - Single Otter

Paul Claus
ultima@mtaonline.net

"Our phone number here is 1-206-529-4241. There is a delay so be prepared. Call us the night before each flight."


Aircraft Information:


Jet Ranger

206BIII

N371AH

Pilot Name

George Carter

Dates

July 3 - July 7, 2005


ASTAR

AS350B2

N216CH

Pilot Name

George Carter

Dates

July 10 - August 4, 2005


Configured for 5 passengers or 1000# gear


VPR Phone Numbers:

Office

907.455.4214

Naomi cell

907.590.3954

Naomi at Orca Adventure Lodge, Cordova

866-424-ORCA

Alaska State Troopers (24hr dispatch)

907.451-5100

Bering Glacier Camp

Can send either Iridium a short email by going to www.iridium.com

011-8816-314-41155 primary

011-8816-414-41151 secondary

Scott Guyer, BLM Bering Glacier Camp Manager

907.271.3284

Anchorage

VECO Iridium phone numbers

011-8816-2145-1025 (NSF 1844)

011-8816-2145-1026 (NSF 1845)

Flight Plan:

Veco Polar Resources is the contractor for the following aircraft however the researchers involved with this project, including Dr. Terry Pavlis, will be the on-the-ground point of contacts for flight operations. VPR recommends that a flight manager needs to be assigned for this project. This is a grant responsibility.

The BLM Bering Glacier camp manager will be providing flight following. Veco Polar Resources project manager Naomi Whitty will be in Cordova in early July to begin flight operations.


Jet Ranger Flight Plan - July 3 - July 7

All dates listed below, aside from the mobilization and demobilization dates, are provided by the research crew and subject to change.

Date

Activity

July 2

Jet Ranger charter begins in Cordova. Helicopter mobs in evening. Pilot to team meeting. (Pilot - please call Naomi Whitty 907.590.3954.)

July 3

Work near Cordova and eastward to Katalla area. Helicopter ends day in Cordova. Pilot and GPS crew spend night in Cordova.

July 4-7

Helicopter works with researchers and GPS stations.

July 8

Helicopter demobs to Juneau.


Sky Van Flight Plan - July 9 - 10

Date

Activity


POC in Cordova - Jamie Rohs, Josh Stacnik, Martin Lafevers, Roger Hansen, Steve Estes and John Sandru. They will provide loading assistance at Cordova and Bering Glacier.

July 9 -10

Sky Van charter flights taking 20,000# seismic equipment to Bering Glacier camp. Cargo only flight requiring multiple shuttles to Bering Glacier (Cape Yakutaga no longer needed.)


A-STAR Flight Plan - July 10 - August 4

Date

Activity

July 9

A-Star contract begins - mobilization to Bering Glacier camp in evening.

July 10-August 4

Helicopter work, as directed by coordinator.

August 4

Last day of A-Star contract - demob to Juneau at end of day.


Fixed Wing Flight Plan

Paul Claus has been contracted to fly for VPR on the following days. Please call the night before each scheduled flight (1-206-529-4241). He will commute to Cordova in the morning, then will begin shuttle to the Bering Glacier camp and return to Cordova. VPR expects that on these days there may be several loads to transport in or out. Flying on days other than those listed is the responsibility of the grant.


Date

Activity

July 3

Passengers and gear to Bering Glacier camp.

July 9

Passengers and gear to Bering Glacier camp.

July 10

Passengers and gear to Bering Glacier camp - Fishing and Flying?

July 13

Two passengers and gear to Bering Glacier camp. Can Paul change - not do 17th, do 13th.

July 17

One passengers and gear to Bering Glacier camp - Fishing and Flying?

July 18

Passengers and gear to Bering Glacier camp - vendor not confirmed, funding not confirmed yet - Fishing and Flying?

July 24

Passengers and gear to Bering Glacier camp - back-haul people and gear out back to Cordova.

August 5

Back-haul people and gear out back to Cordova.


Hazardous Cargo

All hazardous materials need to be packaged appropriately in USDOT certified containers, have accurate paperwork, and be identified to the pilot.


Fueling

The contracting company will be responsible for all fuel & fueling equipment.


Safety

VECO Polar Resources requires that all researchers using VPR-chartered aircraft have emergency survival gear and a satellite phone on-board. Emergency gear should include additional dry warm clothing, food, and water. Additional gear may include bear protection, shelter, and a sleeping bag.


Emergencies

In the event of an emergency, please notifying the Alaska State Troopers and the VPR office.


Additional VPR Phone Numbers:

Office

907.455.4214

Naomi cell

907.590.3954

Naomi home - Fairbanks

907.374.6036

Naomi home - Healy

907.683.0102

Marin cell

907.590.0755

Marin home

907.479.8717

Jill Cell

720.320.6155

Jill home

303.471.7533

Jill #2

303.919.9073




Page 3 of 3